Skip to main content

Advertisement

Table 3 Amplitude and latency of ERP components

From: Electrophysiological evidence for abnormal preparatory states and inhibitory processing in adult ADHD

    Amplitude Latency
    Controls ADHD Controls ADHD
  Cue P3 (Pz) 6.45 (2.53) 4.43 (1.91) 396.88 (47.55) 398.85(63.11)
   CNV (area at Cz) -3.21 (2.49) -2.09 (1.22) # #
CPT-OX Go P3 (Pz) 7.64 (3.49) 5.89 (2.60) 338.09 (33.23) 336.35(49.97)
   N2 (Fz) -3.68 (3.73) -1.82 (3.32) 253.32 (35.51) 261.92(38.22)
  No-go P3 (Cz) 7.45 (3.71) 5.38 (2.63) 341.99 (31.13) 360.68(49.56)
   N2 (Fz) -4.44 (3.44) -2.88 (2.57) 240.43 (28.38) 250.59(25.80)
  Cue P3 (Pz) 5.49(1.92) 3.41(1.63) 407.81 (67.84) 343.97(95.41)
   CNV (area at Cz) -3.72 (2.25) -1.88 (1.30) # #
CPT-OX with flankers Go P3 (Pz) 7.71 (3.14) 6.90 (4.17) 364.65 (49.74) 374.13(60.57)
   N2 (Fz) -3.67 (2.39) -2.95 (3.14) 242.38 (33.01) 251.09(41.96)
  No-go P3 (Cz) 7.56 (3.23) 4.57 (3.17) 366.99 (34.95) 373.05(56.28)
   N2 (Fz) -5.20 (2.97) -4.31 (2.57) 248.63 (26.86) 260.42(25.98)
  1. # there is no latency measure of the CNV