| UG proposal | UG proposal controlled for DG proposal | DG proposal | DG proposal controlled for UG proposal | UG-DG proposal | BAS RR | BAS Dr | BAS FS |
---|---|---|---|---|---|---|---|---|
BAS RR | .08 | .21 | -.34** | -.37** | .38*** | 1 | - | - |
BAS Dr | .18 | .27* | -.27* | -.34** | .36** | .55*** | 1 | - |
BAS FS | -.01 | .03 | -.15 | -.14 | .15 | .51*** | .45*** | 1 |